SMR Gearbox Set up

SMR Gearbox Installation
Satisfactory functionality depends upon correct set up. lubrication and upkeep. hence it is crucial the guidelines in the set up and servicing leaflet. provided with each and every gearbox. are followed carefully. some of the crucial facets of belt and torque-arm installation are listed under.
1. Install pulley on gearbox input shaft as shut to the reducer doable, and mount reducer on driven shaft as shut to bearing as sensible. failure to carry out this will likely result in excess loads within the input shaft bearings and output bearings and could result in their premature failure.
2. Install motor and wedge belt drive with all the belt pull at somewhere around 90° to your center line in between driven and input shafts. this may permit tensioning of your wedge belt drive with all the torque arm which should preferably be in tension. if output hub runs anti-clockwise. torque arm ought to be positioned the best.
three. lnstall torque-arm fulcrum on a rigid support so that the torque-arm will be at somewhere around right angles to your center line with the driven shaft plus the torque arm case bolt. be certain there exists ample take up in the turnbuckle for belt stress adjustment.
Preserve shut.
Bell drive could possibly be located in any convenient postion. should the torque arm would be to be used to tighten the belts, the drive need to be at about tight angle towards the line among the input and output shafts.
Bell drive may be located to your appropriate if desired.
If output hub rotates clock-wise. place belt drive and torque arm in opposite course to that shown from the illustration.
Torque arm and belt take up.
Torque arm can be mounted to your correct if desired.

Tags:

Recent Posts